It feels like we are in a holding pattern with our house projects! The kitchen back splash has some issues that need to be readdressed before we proceed with out tiling. These kinds of things are inevitable, especially considering how quickly we tried to get everything done in preparation for the counter top arrival. Even more especially considering how I was flying solo on most of it due to my husband having surgery right in the middle of it all. Add in a huge project for work, and a couple of colds, and not much has been getting done around here.
But there is an upside to everything! We have all the supplies, including the tile, so as soon as we fix some bumps and unevenness we can get started right away. We have an awesome new faucet for our sink, the Lewiston from Delta. I was able to order two shelves for the laundry room project, which once they arrive, will be in full swing. And, we have at very least been able to move most of the stuff back into the kitchen, and we can even cook and eat at home again.
The adventures in DIY never end, do they?



